In cases where a formal contract exists between the client and the contractor, which of the following are valid procedures when dealing with changes during the project life cycle:
  • The changes are only issued by an authorized person.
  • The changes are evaluated in terms of cost, time, and performance.
  • The originator is made aware of the implications before the change is put into operation.
  • All of the above.